Kannegiesser
eVue Operations

PLC / CB Separation Dashboard

Source: job_2026-04-28_21h17m24.csv
Snapshot: 2026-04-28

Drop the CSV here

Same filters will be applied automatically.

Snapshot

175 eVue jobs (v6.0+; excludes Supertrack, closed sites, demo/test, and the 2000-series & 9997–9999 internal jobs).

Total jobs

175

100% Jobs in this dataset

Physical vs virtual PLC

89/ 175

50.9% Run on physical PLC hardware
Physical PLC · 89 Virtual PLC · 86

Jobs on 10.9 schema

22/ 175

12.6% Migrated to 10.9 schema
10.9 schema · 22 Legacy · 153

Physical vs virtual PLC

10.9 schema adoption

Charts

Separation funnel

Total → Physical PLC → 10.9 schema

PLC composition by version family

Each bar represents one family
Physical PLC + 10.9 schema Physical PLC (legacy schema) Virtual PLC

Breakdowns

Physical PLC by version family

89 of 175 jobs · 50.9%

Virtual PLC by version family

86 of 175 jobs · 49.1%

Version family distribution

Click a version to see its jobs

10.9 separation by version family

Share of jobs in each version family that are running the 10.9 separation. Click a family to see its jobs.

10.9 separation by version family

22 of 175 jobs · 12.6%

Jobs on the 10.9 schema

All 22 jobs currently running the 10.9 schema, with installed eVue version. Every job on 10.9 uses a physical PLC.

Job Name PLC Version
* Job 2493 (Cooperative San Marcos) is still separated by VLANs, not physical separation.
Version family

Click a column to sort · Shift+click to add a secondary sort 0 jobs
Job▲▼1 Name▲▼1 PLC▲▼1 10.9?▲▼1 Version▲▼1